Four health states, honestly applied
On Track, Watch, Risk — and Unknown for a project with nothing to measure yet. An unmeasured project is not a failing one, so it is not scored as though it were.
See it without asking for it.
Pulse reads health, trend, schedule performance, and risk across every project in the portfolio. It is the answer to “how are we actually doing” that does not require a status meeting to produce.
Step through the three levels Pulse reads at.
Every project lands in one of four states: On Track, Watch, Risk, or Unknown. Unknown is deliberate — a project with nothing to measure has no health, and calling that zero would read as a crisis.
Each project carries a health score, a trend, and a schedule performance figure — progress achieved against the progress expected by now — alongside the days remaining until its deadline.
Top risks are surfaced across the portfolio and ranked by severity, so the conversation starts with the two projects that need a decision rather than the ten that do not.
What Pulse reads, and what it refuses to guess at.
On Track, Watch, Risk — and Unknown for a project with nothing to measure yet. An unmeasured project is not a failing one, so it is not scored as though it were.
Health is tracked over time and reported as improving, stable, or declining, with the portfolio trend shown alongside the current score.
Progress achieved measured against the progress expected by now. A project can be busy and still be behind, and this is the number that says so.
Every project card carries its end date and the days remaining, so a deadline arrives as a countdown rather than a surprise.
Beyond the executive view, Pulse breaks out delivery confidence, the pipeline of work in flight, and a single project in depth.
The risks that matter are surfaced across the portfolio and ordered by severity, from Critical down to Low.
Take the current view out of the app when a board pack or a supplier review needs it.
A Pulse project card reads the project’s calculated progress — the same figure the projects list and the project header show.
A project Pulse cannot assess is reported as Unknown rather than scored zero. Zero reads as a project in trouble; Unknown says there is not yet enough work underneath it to judge. A dashboard that hides the difference is worse than one that admits it.